Load or paste your monitoring history, set the maximum instantaneous charge, and add the
receptors that carry a limit.
Each receptor is then reported with a predicted PPV, the
probability that the limit is exceeded, and the charge that would bring that
probability back to your target.
A single predicted number is not a compliance case. The scatter around a site law is
typically a factor of two either way, which is why the probability matters more than the point
estimate.