Design
Demo — iron ore bench
Reset
Comparison
Store design A
Clear A
Thresholds
Oversize
m
Fines
m
Oversize tolerance
%
Output
Report
JSON
CSV
Help
Workflow
Pattern and charge
The geometry Kuz-Ram reads. Everything downstream moves when these move.
Burden
m
Spacing
m
Bench height
m
Hole diameter
mm
Charge length
m
Explosive column only. Stemming is not charge.
Charge per hole
kg
Relative weight strength
ANFO=100
Emulsions 100–115, ANFO 100, heavy ANFO 105–115.
Rock density
t/m³
Drilling accuracy W
m
Standard deviation of hole position at the toe. Cunningham's (1 − W/B) term.
Holes on the shot
count
Rock factor A
Where all the uncertainty lives. Built from the Lilly components, or entered from a calibration blast.
RMD — rock mass description
10 — powdery / friable
20 — vertically jointed
50 — massive
JPS — joint plane spacing
10 — close, under 0.1 m
20 — intermediate, 0.1 m to oversize
50 — wide, above the oversize size
JPA — joint plane angle
20 — dipping out of the face
30 — strike perpendicular to the face
40 — dipping into the face
UCS
MPa
Hardness HF = UCS ÷ 5 when Young's modulus is 50 GPa or more.
Young's modulus
GPa
0 = not known. Below 50 GPa, Lilly uses HF = E ÷ 3 instead.
Override A from a calibration blast
Back-calculated from a measured x50 on this bench, in this rock.
Predicted passing curve
Rosin–Rammler and Swebrec on the same x50 and n. They agree at the middle and separate in the fines.
A ±20% band
Swebrec
Design comparison
Nobody wants one prediction. They want to know whether tightening the pattern is worth it.
Sensitivity to powder factor
Burden and spacing scaled together at constant charge per hole — the trade a pit actually makes.
Oversize and fines
Tonnes above and below your own cuts, and the boulder count that follows from them.
Crusher opening
m
Anything above this is a boulder that has to be handled twice.
Fines cut
m
Fragment shape factor
Volume = factor × d³. 0.52 is a sphere; angular rock sits near 0.5.
Secondary breakage
$/boulder
Your number. Leave at 0 and no dollar value is reported.
Crushing + haulage
$/t
Drill and blast
$/hole
Without this, a tighter pattern always looks cheaper.